+33 563 754 842

1 – Context: why fragmentation is expensive

Business problem

The workshops for signs, signage, display, vehicle marking, printing and textiles experience daily operational frictions: multiple price sources, line-by-line calculators and commercial documents that mix different technical flows.

Operational consequences

In concrete terms, these malfunctions cause repeated manual checks, pricing errors, manual or forgotten proofs, and production replanning that erodes the margin.

2 – Three-pronged method for transforming the organization

1. Unify the sources of truth

Centralize purchase prices, dimensions and material types in a single repository, locked after import, to prevent uncontrolled local modifications.

  •   Import and synchronize inventory data from the ERP/accounting system while locking critical fields.
  •   Manage dimensions and variations (lengths, weights) in the supplier tab
  •   Display a reliability indicator on each price (green/orange)

2. Overhaul of the computers

Separate global parameters (availability, commercial conditions) from product lines and add a free field visible to salespeople, graphic designers and operators to reduce blockages.

  •   Move the "availability" to the project/folder level
  •   Use configurable but locally modifiable calculators
  •   Add a free text field for technical and commercial comments

3. Separate the pricing and production workflows

Issue a quote for each type of production (small format, large format, signage, offset printing, vehicle graphics). If the client needs only one document, group several quotes into a single file to maintain traceability and machine routing.

  •   Create quote templates by workflow
  •   Group multiple quotes into one client file for a single invoice
  •   Automatic routing to site/machine based on machine/material filters

3 – Concrete functions to be implemented

Immediate actions (pragmatic implementation)

Prioritize simple and testable projects to secure operations without halting commercial activity.

  •   Import inventory and lock supplier data after verification
  •   Remove the repetition of the provision on each line
  •   Deploy a visual indicator of price reliability for salespeople and graphic designers
  •   Test the automatic generation of BAT files and the email configuration before the full migration

Features to be included in the software

  •   Task view filtered by machine and material for operators
  •   Seniority indicators and blocking of tasks awaiting BAT
  •   Customer display options: hide technical details and show an overall price

4 – Measurable field impacts and examples by universe

Operational gains

The proposed devices produce rapid and measurable results in the field.

  •   Time savings: several hours per week saved for sales representatives and project managers
  •   Error reduction: stable purchasing costs and fewer discrepancies billed compared to forecasts
  •   Reduced maintenance: simpler computers and fewer ad hoc additions

Signage / Wayfinding / Display

Separating large format signage and interior signage into separate quotes avoids routing errors to cutting or large format printing and clarifies installation dates.

Printing (offset, small format)

Centralizing paper costs and discounts on a single source allows the use of cost prices to drive price changes and limit losses on large print runs.

Vehicle marking

Managing films and exposure times at the project level rather than by line reduces duplication and facilitates the allocation of technical teams.

5 – Gradual deployment and best practices

operational roadmap

Don't migrate everything at once. Plan short, observable steps to validate technical and operational choices before generalization.

  •   Phase 1: Stock synchronization and field locking
  •   Phase 2: Redesign of the calculators and addition of the free field
  •   Phase 3: BAT testing, email configuration and gradual switchover of quotes

Rules of governance

Define a single instance to manage the sites, clear rules on who modifies the materials repository, when to lock a change and how to report an anomaly via reliability badges.

6 – Conclusion: priorities for preserving the margin

Synthesis

The solution lies in implementing a structural change: a single source of truth for costs, a redesign of the calculation systems, and the separation of pricing workflows. These priorities transform complexity into operational scalability.

Recommended action

Start by centralizing your inventory and locking down supplier data, remove the product line availability feature, and implement a price reliability indicator. Then, test production management and proof generation before extending the quote migration.